Skip to content
EARTH & SPACE / PROGRAM ATLAS

Earth and Space

ZENIT Academy

Work through the decisions behind ZENIT’s models. Plan a SafeSpot outage on Earth, or follow a Qi crew through life support, protected startup and space docking.

Concept illustration of the coastal ZENIT Earth Research Facility
The setting for the first Earth Academy lecture

Earth Academy · Infrastructure and safety

Keep a SafeSpot Running

Plan for a 24-hour winter outage at the Earth Research Facility. Start with the default essential loads. Add an optional service and see whether the reserve can power every essential service for the full outage.

Critical Continuity SafeSpot · Simulated winter outage

Both grid power and the data link are down

On-site reserve power is available. Local communications and monitoring can run while reserve power lasts. Remote reports wait until the external link is restored and checked.

  • Grid power Unavailable
  • External data link Unavailable
  • Usable reserve 24 kWh
How the estimate works

The model divides the usable energy in the reserve (kWh) by the combined average load (kW) to estimate runtime in hours. The 24 kWh reserve and individual loads are teaching assumptions. Demand stays constant in the model. Heating, battery temperature, start-up peaks, recharging and equipment limits are outside its scope.

What happens when grid power and the data link return?

Review the local outage log, confirm that power and communications are stable, and check that local readings are current. Keep essential services running while you restore optional loads and resume reporting.

Check your understanding

Space Academy · Qi Vanguard Fleet

From a habitable ship to a safe approach

Follow these exercises in order. First keep the crew’s cabin habitable, then check what needs to be true before a ship system starts or a shuttle approaches.

Lesson 1 · Crew environment

Life Support in Space

Trace cabin air, oxygen and water. In the outage exercise, see how the crew’s refuge options change with available power.

Lesson 2 · Protected startup

Start one branch aboard Zorak

Compare fresh and stale CMC readings, then follow the separate permission and coil feedback checks.

Lesson 3 · Navigation

Assess a shuttle approach

Use the AGCM exercise to decide what to do with verified alignment, a stale host report or conflicting readings.

Continue to the Norak surface mission ↗

Reactor physics

Civilian Fission Study

When a nucleus splits, it releases energy and can release neutrons that split more nuclei.

  1. A nucleus splits
  2. Neutrons are released
  3. Some cause fission
  4. New neutrons can continue the chain

Steady reactor power requires a balance between neutron production and losses. Coolant carries the resulting heat to the power conversion system.

U.S. NRC on fission chain reactions