Models depict proposed architecture and system relationships. Physical performance and qualification depend on the evidence in each project record.
System maps
Select a diagram to inspect each system and its connections.
THE DIAGRAM COLLECTIONR2 / 10 NOV 2026
01 / SHARED DIAGRAM
One programme. Two connected branches.
Start with the Earth and Space programmes, then follow their main areas of work.
Select a block to explore its role
Scope / physical relationship
Swipe across the diagram to explore it, or open the full-size view.
SELECTED SYSTEM
THE ZENIT PROGRAM
The ZENIT Program is the common project framework. Its Earth and Space branches share named principles and system roles, while retaining distinct application requirements.
Read the complete text version ↗
THE ZENIT PROGRAM
The ZENIT Program is the common project framework. Its Earth and Space branches share named principles and system roles, while retaining distinct application requirements.
ZENIT Earth Program
Earth brings together energy, hydrogen mobility, infrastructure and environmental understanding. Earth plant and vehicle requirements are not automatically Space requirements.
ZENIT Space Program
Space brings together the Qi Vanguard Fleet, vessel systems, scientific exploration and long-term research concepts. The diagrams describe the project architecture, not operational spacecraft.
Energy & useful heat
The Earth facility uses a single-core planning baseline and separates the Fusion Island from the SERAT Energy Island. Useful heat recovery needs compatible temperatures, demand and a retained rejection path.
Hydrogen mobility
ZC-1, ZA-1 and the marine concepts apply hydrogen-focused mobility within their own operating and safety requirements. The current ZC-1 drivetrain reference is hydrogen combustion.
Infrastructure & knowledge
Infrastructure work covers human-readable information, sensing, essential services and resilience. LSI explains system state; it does not replace independent safety authority.
Qi Vanguard Fleet
The current planning register has 17 crewed entries: Zorak, Centri, three research vessels including Ranok in reserve, three carriers, eight interceptors and Norak. The R3 register assigns 62 drones across Zorak, Anorak, Fronak and Norak.
Vessel power & reference
Fusion provides primary energy; protected fuse stages and SERAT distribute it. CMC provides the vessel reference and GENI handles field-control interfaces. These roles remain separate.
Shielding & exploration
The Outverse reference uses five concentric layers across five controlled hull sectors, for 25 coordinated regions. Propulsion, shielding and advanced travel concepts retain their stated evidence and qualification limits.
Connections
THE ZENIT PROGRAM → ZENIT Earth Program (Scope / physical relationship)
THE ZENIT PROGRAM → ZENIT Space Program (Scope / physical relationship)
ZENIT Earth Program → Energy & useful heat (Scope / physical relationship)
ZENIT Earth Program → Hydrogen mobility (Scope / physical relationship)
ZENIT Space Program → Qi Vanguard Fleet (Scope / physical relationship)
ZENIT Space Program → Vessel power & reference (Scope / physical relationship)
ZENIT Space Program → Shielding & exploration (Scope / physical relationship)
02 / SHARED DIAGRAM
Information, control and independent safety.
See how NEXUS, AXIOM, ZSA and local protection have different responsibilities.
Select a block to explore its role
Information / control requestAcceptance / configuration oversightScope / physical relationshipIndependent protection / constraint
Swipe across the diagram to explore it, or open the full-size view.
SELECTED SYSTEM
NEXUS
NEXUS interprets telemetry, supports diagnosis and recommends coordinated action. It cannot override AXIOM, ZSA acceptance or autonomous local protective trips.
Read the complete text version ↗
Sensors & telemetry
Measurements carry identity, timing and quality information. Missing, stale or conflicting data must remain visible; a received message is not automatically an authorized command.
NEXUS
NEXUS interprets telemetry, supports diagnosis and recommends coordinated action. It cannot override AXIOM, ZSA acceptance or autonomous local protective trips.
Local controllers
Local controllers apply accepted configuration and operating limits. Supervisory requests remain constrained by the local protection design and AXIOM's permitted envelope.
Physical systems
Physical equipment is the controlled system. Its safety case depends on its actual configuration and evidence, not the completeness of a digital diagram.
ZENIT Safety Authority
ZSA owns independent test authorization, hazard-log and anomaly closure, configuration control and final acceptance. This is a governance and evidence role, separate from real-time supervision.
AXIOM
AXIOM retains final physical constraint authority in the framework. In the Earth magnet-protection baseline it may impose a more conservative hold, but may not block an autonomous protective trip.
Independent local protection
The Earth qualification baseline requires local protection to act without NEXUS or the plant network. The later SERAT requirements preserve that independent trip path; AXIOM cannot suppress a required autonomous trip.
People & LSI
LSI and human-facing views explain measurements, uncertainty and consequences. They support understanding and decisions without acquiring an independent right to defeat protection.
Connections
Sensors & telemetry → NEXUS (Information / control request)
NEXUS → Local controllers (Information / control request)
Local controllers → Physical systems (Scope / physical relationship)
AXIOM → Local controllers (Independent protection / constraint)
NEXUS → People & LSI (Information / control request)
Independent local protection → Physical systems (Independent protection / constraint)
03 / EARTH DIAGRAM
One core. Two distinct islands.
Follow the planning-level electricity and useful-heat interfaces of the Earth facility.
Select a block to explore its role
Heat transferElectrical / power interfaceIndependent protection / constraint
Swipe across the diagram to explore it, or open the full-size view.
SELECTED SYSTEM
Isolating heat exchange
Use compatible, owned indirect interfaces across the Fusion/SERAT boundary. A heat pump is conditional on a useful demand and its full electrical and auxiliary input; no universal COP is assigned.
Read the complete text version ↗
Single plasma fusion core
One steady-state stellarator-derived core confines fuel plasma. Heat transfers from reactor components to the conversion interface. The thermal design target is 5.30 GW.
Electrical conversion
Conversion is shown as a functional interface rather than a selected thermodynamic cycle or machine. Its detailed hardware, efficiency and qualification require evidence.
SERAT protected distribution
SERAT manages protected distribution and thermal interfaces from its separate Energy Island. Island separation includes ownership, fault containment and compatible indirect interfaces.
Grid & useful loads
The 2.00 GWe grid value is the facility's planning target. The new power/thermal upgrade does not establish a higher plant rating or measured savings.
Compatible heat source
Heat recovery begins with an actual source/sink inventory. Record temperature, timing, fluid, pressure and available heat before choosing direct exchange or a heat-pump temperature lift.
Isolating heat exchange
Use compatible, owned indirect interfaces across the Fusion/SERAT boundary. A heat pump is conditional on a useful demand and its full electrical and auxiliary input; no universal COP is assigned.
Useful heat customer
Credit useful heat at the customer boundary. Match supply to demand and required delivery/return temperatures, and avoid counting one recovered stream twice.
Rejection or source derating
Retain a qualified rejection or source-derating route when useful demand, a pump or a recovery interface is unavailable. Internally moving heat does not make it disappear.
Independent plant protection
Quench protection, fuel-cycle requirements and independent ZSA acceptance retain their own evidence gates. The power/thermal addendum does not close physical qualification.
Connections
Single plasma fusion core → Electrical conversion (Electrical / power interface)
Electrical conversion → SERAT protected distribution (Electrical / power interface)
SERAT protected distribution → Grid & useful loads (Electrical / power interface)
A readable redraw of the recovered ZPA-UNIFIED v2.0 power-network concept.
Select a block to explore its role
Alternative protected power pathInformation / control requestElectrical / power interface
Swipe across the diagram to explore it, or open the full-size view.
SELECTED SYSTEM
D · Emergency reserve
Domain D protects essential hospital, emergency, communications, water and shelter services in the recovered priority concept. Exact capacity and operating restrictions remain installation-specific.
Read the complete text version ↗
Existing & new sources
The recovered design connects compatible legacy and new sources through owned interfaces. This does not imply every source is renewable or that all listed technologies are installed.
Source interface & protection
Each source needs its own conversion, protection, metering and local-control envelope. The modern SERAT addendum adds explicit acceptance of returned power and bounded buffering.
Controller A
Controller A is one lane of the redundant bidirectional coordination concept. Redundancy and fail-operation must be demonstrated for a selected installation.
Controller B
Controller B supplies the separate coordination lane. A synchronization link informs coordination without turning local safety into a network-dependent function.
Electrical spine A
Spine A is one protected electrical distribution path. Electrical, thermal and data networks retain separate physical and functional boundaries.
Electrical spine B
Spine B is shown as a separately protected alternative path. The drawing does not establish a fault-current rating, changeover time or automatic permission to parallel sources.
A · Grid services
The recovered architecture places curtailable grid export and grid services in Domain A. This is a project priority allocation, not a universal rule for every facility.
B · Industry & mobility
Domain B groups contracted industrial and mobility services. Its own controllers, protection, reserve limits and restart requirements define the installation.
C · Community & households
Domain C groups homes, buildings, heating, water and community services. Local reserve ownership prevents the same bounded reserve being promised to multiple loads.
D · Emergency reserve
Domain D protects essential hospital, emergency, communications, water and shelter services in the recovered priority concept. Exact capacity and operating restrictions remain installation-specific.
Connections
Existing & new sources → Source interface & protection (Electrical / power interface)
Source interface & protection → Controller A (Electrical / power interface)
Source interface & protection → Controller B (Electrical / power interface)
Controller A → Controller B (Information / control request)
Controller A → Electrical spine A (Electrical / power interface)
Controller B → Electrical spine B (Electrical / power interface)
Electrical spine A → A · Grid services (Electrical / power interface)
Electrical spine A → B · Industry & mobility (Electrical / power interface)
Electrical spine A → C · Community & households (Electrical / power interface)
Electrical spine A → D · Emergency reserve (Electrical / power interface)
Electrical spine B → A · Grid services (Alternative protected power path)
Electrical spine B → B · Industry & mobility (Alternative protected power path)
Electrical spine B → C · Community & households (Alternative protected power path)
Electrical spine B → D · Emergency reserve (Alternative protected power path)
05 / SPACE DIAGRAM
Power generation is separate from reference.
Follow QVCO-R1 while keeping the CMC and GENI interfaces outside the primary-energy chain.
Select a block to explore its role
Information / control requestReference / field interfaceElectrical / power interface
Swipe across the diagram to explore it, or open the full-size view.
SELECTED SYSTEM
SERAT Power Corridor
SERAT supplies protected and prioritized vessel loads. The later conversion addendum attaches bounded converters and local buffers at compatible protected branches without reordering QVCO-R1.
Read the complete text version ↗
Fusion A
Fusion A converts energy from confined fuel plasma and feeds its own Local Fuse Chamber. Local shutdown and cooling sit at the source.
Fusion B
Fusion B has its own confined fuel plasma and feeds a separate protected lane. Reactor independence and source ratings require class-specific evidence.
Local Fuse A
The local fuse stage isolates and conditions lane A before central coordination. It preserves the adopted chamber order.
Local Fuse B
Lane B retains its own local isolation interface. Fault containment must be checked against the selected source and installation.
Central Bidirectional Fuse
The central bidirectional chamber coordinates the protected source lanes. It is followed by the SERAT Power Corridor; it does not replace the independent source safety paths.
SERAT Power Corridor
SERAT supplies protected and prioritized vessel loads. The later conversion addendum attaches bounded converters and local buffers at compatible protected branches without reordering QVCO-R1.
Vector Accelerator
The Vector Accelerator receives conditioned power within the conceptual propulsion chain, with distinct GENI control and CMC reference inputs. No demonstrated thrust, speed or efficiency is assigned.
Main propulsion
The working major-vessel architecture describes two stern propulsion assemblies and separate hull manoeuvring thrusters. These remain conceptual project records.
CMC
The Central Magnetic Core supports vessel reference, synchronization and compensation. It is neither the fusion source nor an additional energy supply.
GENI
GENI coordinates the authorized field-control interface. Power comes from the protected SERAT path; a control or reference link is not another source of energy.
Connections
Fusion A → Local Fuse A (Electrical / power interface)
Fusion B → Local Fuse B (Electrical / power interface)
Local Fuse A → Central Bidirectional Fuse (Electrical / power interface)
Local Fuse B → Central Bidirectional Fuse (Electrical / power interface)
Central Bidirectional Fuse → SERAT Power Corridor (Electrical / power interface)
SERAT Power Corridor → Vector Accelerator (Electrical / power interface)
Vector Accelerator → Main propulsion (Electrical / power interface)
CMC → Vector Accelerator (Reference / field interface)
GENI → Vector Accelerator (Information / control request)
06 / SPACE DIAGRAM
Seventeen vessels. Defined responsibilities.
The reconciled planning register, interceptor hosts, reserve research and local shield duties.
Select a block to explore its role
Information / control requestScope / physical relationship
Swipe across the diagram to explore it, or open the full-size view.
SELECTED SYSTEM
Zorak
Zorak retains strategic command and fleet hazard decisions. Its assigned drone allocation is 24; Araknok and Ferko retain Zorak as host. Centri coordinates readiness and recovery without overriding local protection.
Read the complete text version ↗
Zorak
Zorak retains strategic command and fleet hazard decisions. Its assigned drone allocation is 24; Araknok and Ferko retain Zorak as host. Centri coordinates readiness and recovery without overriding local protection.
Anorak & Fronak
Both research vessels carry 16 drones. Anorak carries five inspection drones and six planetary survey drones; Fronak carries three and eight respectively. Each carries three relays and two long-duration explorers.
Herko
Herko carries Zuma and Zarek. Anorak is the Group A research vessel in the current fleet reference.
Derko
Derko carries Rekor and Jetnok. Fronak is the Group B research vessel in the current fleet reference.
Sorko
Sorko remains near Zorak for anomaly-response readiness, with Serko and Zotno docked under the working doctrine.
Zuma · Zarek
Zuma and Zarek are the Group A interceptor pair. Interceptors remain docked during transmission and cruise in the working fleet doctrine.
Rekor · Jetnok
Rekor and Jetnok are the Group B interceptor pair. This map describes allocation and docking, not physical distances or operating readiness.
Serko · Zotno
Serko and Zotno are assigned to Sorko in Group C. The pair remains weapon-safe while docked under the adopted doctrine.
Araknok · Ferko
Araknok and Ferko are Zorak's interceptor reserve. The anomaly-response doctrine may assign them to an investigation unless flagship defence requires them.
Centri
Centri coordinates readiness, degraded coverage and recovery under Zorak. Its longitudinal CFH-M1 hull is provisional. Fleet coordination does not replace each vessel's independent protection.
Ranok
Ranok retains the accepted reserve research role and a coordination interface with Centri. Its physical specification remains unresolved, with no new drone or interceptor allocation.
Norak
Norak stores two orbital relays and four planetary survey drones. Its roadster and drone bays support surface operations while the main fleet stages in space.
25-region shield watch
Each shielded vessel retains five layers across five hull sectors. Sensors report hazards and coil state, GENI requests feasible responses, CMC synchronizes and local controllers regulate. Protection ratings remain unassigned.
62 assigned drones
Drone Integration R3 assigns 16 Relay, 12 Deep-Space Survey/Inspection, 28 Planetary Survey and six Long-Duration Exploration drones. Host totals are Zorak 24, Anorak 16, Fronak 16 and Norak 6.
Connections
Zorak → Anorak & Fronak (Information / control request)
Centri → 25-region shield watch (Information / control request)
07 / SPACE DIAGRAM
Five layers. Twenty-five coordinated regions.
Explore the restored original shield: five concentric layers across five controlled hull sectors.
Select a block to explore its role
Swipe across the diagram to explore it, or open the full-size view.
SELECTED SYSTEM
Fore
L5-FOR · Fore. First-contact attenuation and debris response. Monitor compression, impact load and ring current. Regional limits and combined field response require vessel-specific qualification.
Read the complete text version ↗
Fore
L5-FOR · Fore. First-contact attenuation and debris response. Monitor compression, impact load and ring current. Regional limits and combined field response require vessel-specific qualification.
Starboard
L5-STB · Starboard. First-contact attenuation and debris response. Monitor compression, impact load and ring current. Regional limits and combined field response require vessel-specific qualification.
Aft
L5-AFT · Aft. First-contact attenuation and debris response. Monitor compression, impact load and ring current. Regional limits and combined field response require vessel-specific qualification.
Port
L5-PRT · Port. First-contact attenuation and debris response. Monitor compression, impact load and ring current. Regional limits and combined field response require vessel-specific qualification.
Dorsal / ventral
L5-DV · Dorsal–ventral. First-contact attenuation and debris response. Monitor compression, impact load and ring current. Regional limits and combined field response require vessel-specific qualification.
Fore
L4-FOR · Fore. Deflection and directed dispersion. Monitor vector bias and temperature rise. Regional limits and combined field response require vessel-specific qualification.
Starboard
L4-STB · Starboard. Deflection and directed dispersion. Monitor vector bias and temperature rise. Regional limits and combined field response require vessel-specific qualification.
Aft
L4-AFT · Aft. Deflection and directed dispersion. Monitor vector bias and temperature rise. Regional limits and combined field response require vessel-specific qualification.
Port
L4-PRT · Port. Deflection and directed dispersion. Monitor vector bias and temperature rise. Regional limits and combined field response require vessel-specific qualification.
Dorsal / ventral
L4-DV · Dorsal–ventral. Deflection and directed dispersion. Monitor vector bias and temperature rise. Regional limits and combined field response require vessel-specific qualification.
Fore
L3-FOR · Fore. Spatial charge and load distribution. Monitor impedance and synchronization. Regional limits and combined field response require vessel-specific qualification.
Starboard
L3-STB · Starboard. Spatial charge and load distribution. Monitor impedance and synchronization. Regional limits and combined field response require vessel-specific qualification.
Aft
L3-AFT · Aft. Spatial charge and load distribution. Monitor impedance and synchronization. Regional limits and combined field response require vessel-specific qualification.
Port
L3-PRT · Port. Spatial charge and load distribution. Monitor impedance and synchronization. Regional limits and combined field response require vessel-specific qualification.
Dorsal / ventral
L3-DV · Dorsal–ventral. Spatial charge and load distribution. Monitor impedance and synchronization. Regional limits and combined field response require vessel-specific qualification.
Fore
L2-FOR · Fore. Harmonic stabilization and recovery. Monitor phase drift and reserve margin. Regional limits and combined field response require vessel-specific qualification.
Starboard
L2-STB · Starboard. Harmonic stabilization and recovery. Monitor phase drift and reserve margin. Regional limits and combined field response require vessel-specific qualification.
Aft
L2-AFT · Aft. Harmonic stabilization and recovery. Monitor phase drift and reserve margin. Regional limits and combined field response require vessel-specific qualification.
Port
L2-PRT · Port. Harmonic stabilization and recovery. Monitor phase drift and reserve margin. Regional limits and combined field response require vessel-specific qualification.
Dorsal / ventral
L2-DV · Dorsal–ventral. Harmonic stabilization and recovery. Monitor phase drift and reserve margin. Regional limits and combined field response require vessel-specific qualification.
Fore
L1-FOR · Fore. Crew/vessel protection and internal coherence. Monitor leakage, field stability and thermal-loop status. Regional limits and combined field response require vessel-specific qualification.
Starboard
L1-STB · Starboard. Crew/vessel protection and internal coherence. Monitor leakage, field stability and thermal-loop status. Regional limits and combined field response require vessel-specific qualification.
Aft
L1-AFT · Aft. Crew/vessel protection and internal coherence. Monitor leakage, field stability and thermal-loop status. Regional limits and combined field response require vessel-specific qualification.
Port
L1-PRT · Port. Crew/vessel protection and internal coherence. Monitor leakage, field stability and thermal-loop status. Regional limits and combined field response require vessel-specific qualification.
Dorsal / ventral
L1-DV · Dorsal–ventral. Crew/vessel protection and internal coherence. Monitor leakage, field stability and thermal-loop status. Regional limits and combined field response require vessel-specific qualification.
08 / EARTH DIAGRAM
Hydrogen combustion. Coordinated heat control.
Trace ZC-1's fuel and mechanical path separately from its SERAT and auxiliary interfaces.
Select a block to explore its role
Information / control requestHydrogen fuel pathHeat transferElectrical / power interfaceScope / physical relationship
Swipe across the diagram to explore it, or open the full-size view.
SELECTED SYSTEM
Hydrogen combustion engine
The current ZC-1 drivetrain baseline is hydrogen combustion. It is not the electric-motor drivetrain depicted in an older principles illustration.
Read the complete text version ↗
Hydrogen storage
The current ZC-1 reference uses hydrogen storage feeding a protected fuel interface. The illustration does not select a tank rating or certify a pressure vessel.
Hydrogen interface
The recovered SERAT-EV1-C plate includes local isolation, pressure regulation, flow measurement and leak detection. Pressure integrity and vapour handling retain their own scoped project references.
Hydrogen combustion engine
The current ZC-1 drivetrain baseline is hydrogen combustion. It is not the electric-motor drivetrain depicted in an older principles illustration.
Mechanical drivetrain
The engine supplies the mechanical propulsion path. Auxiliary batteries and converters in the control/thermal diagram do not change this into an electric-drive baseline.
Auxiliary electrical supply
Starter and essential-service electrical interfaces support controllers, sensing, communications and cooling. Their presence does not establish traction-motor propulsion.
SERAT local control unit
SERAT coordinates the local coolant pumps, fans, bypass valves, recovery interfaces and protected service power. The recovered diagram separates engine and essential-electronics thermal loops.
Engine & electronics loops
The primary loop serves the engine, while an essential thermal loop serves electronics and safety-support loads. Post-shutdown cooling and sectional isolation are part of the recovered concept.
Heat recovery & rejection
Useful heat may support cabin heating or preheat when compatible. Radiators retain a rejection role; the diagram makes no emissions, efficiency or measured recovery claim.
SERAT local control unit → Hydrogen interface (Information / control request)
SERAT local control unit → Heat recovery & rejection (Information / control request)
RECOVERED FROM THE DESIGN HISTORY
The drawings that came before.
Earlier concept plates, redrawn for clarity. The original illustrations remain available for comparison.
HISTORICAL REFERENCE
These earlier illustrations contain historical proposals and some superseded figures. Use the current maps above for the revised architecture; the notes below identify important differences. Browse the complete Originals collection ↗
ZPA-UNIFIED v2.0
Protected power architecture
Refined visual edition of the July 2026 ZPA-UNIFIED concept. Separate electrical, thermal and data roles are easier to follow; later SERAT interface requirements retain precedence.
This is a refined edition of the historical vessel diagram. It shows 25 regions, matching the restored Outverse design. See the current vessel map and Atlas for the latest system and vessel details.
Refined visual edition of the July 2026 ZTIA concept. Trust-anchor and authority proposals remain historical design material; the independent local-protection boundary stays explicit.
Refined visual edition published on 10 November 2026. Follow the hydrogen-combustion drivetrain, separate engine and electronics cooling circuits, useful-heat recovery and protected auxiliary power. The original remains preserved in Originals; component sizing and physical verification remain open.