Designs and software complete. Physical evidence comes next.
The recorded results come from bounded software checks and selected reference or synthetic cases. Equipment selection, measured hardware performance and physical qualification remain open.
THE DEVELOPMENT DIRECTORY
A purpose. A result. A next test.
Open each design to see what was built, what its model establishes and the evidence still needed.
7 developments
Shared architecture appears in both branches. Each installation requires its own configuration and qualification.
01 / SHARED ARCHITECTUREShared architecture
NEXUS Evidence Checker
Evidence you can trace.
Checks source versions, units, evidence maturity and energy accounts before a structured claim is accepted.
RECORDED OFFLINE RESULT
All nine seeded consistency faults were identified. The audit preserves 22 unknown installation parameters as open.
Design, limits & next evidence +
What was built
A registered extracted-text snapshot and its version identify each source. Claims carry source, branch, evidence maturity, quantity role, units and optional authoritative expected value. Energy ledgers account initial and final storage, input, useful output and losses. The checker returns issue codes and explicitly open parameters.
Flag unsupported maturity, branch transfers, missing sources and mismatched versions or supplied snapshot digests.
Convert supported units before comparison; distinguish dimensions and the declared thermal/net-electric quantity role.
Check energy closure and repeated credit identifiers; expose unequal storage endpoints in a savings claim.
Preserve unknown equipment values as null and list them as open. A clean audit is not physical release.
Current limits
The checker assesses supplied records; source truth and independent acceptance still need review.
Next verification
An independent reviewer supplies a blinded set of current and superseded records plus misleading claims. Freeze the expected labels before execution, retain every false positive and missed issue, and verify source access controls outside this checker.
Z7-NEC-R1 · Reference design + offline prototype
02 / EARTH ENERGYEarth
SERAT Heat-Service Module
Useful heat, fully accounted.
Matches available heat, electrical input, storage and customer demand within a defined service boundary.
RECORDED OFFLINE RESULT
The selected reference case delivers 400 kWh of useful heat using 140.625 kWh of electricity plus recovered heat. In the varied runs, 88 of 200 profiles meet the matched-service conditions; 112 retain unmet demand.
Design, limits & next evidence +
What was built
Source boundary -> isolated exchange or mapped heat pump -> one fixed useful-temperature service domain and thermal store -> customer. Direct exchange is preferred where the source clears the required approach temperature. Storage can discharge before heat upgrading; only direct recovered heat charges this reference store. Meter compressor, backup and recovery auxiliaries separately. Customer loss leaves source rejection or derating available.
No COP extrapolation; exclude impossible heat-pump/Carnot conditions and account the required auxiliary supply.
Reconcile source heat plus electricity and initial storage with useful heat, final storage and rejected/lost heat.
Report unmet demand explicitly. Compare resistance-heating input only at equal delivered service and equal initial/final store inventory.
Preserve a separately engineered rejection/derating path when useful heat acceptance is unavailable.
Current limits
These are synthetic reference inputs. Actual source, customer and equipment maps are still required.
Next verification
Use an approved instrumented thermal bench with the actual source and customer temperature/demand maps. Record calibrated flow, temperature, electrical terminals, store inventory and rejected heat. Compare source-on/source-off cases at matched useful duty. Include loss of customer demand and equipment derating within the bench's approved limits.
Z7-HSM-R1 · Reference design + offline prototype
03 / SHARED ARCHITECTUREShared architecture
Joint Power and Thermal Reserve Scheduler
Power and cooling, together.
Allocates optional loads only when power, usable energy and thermal recovery capacity can support them together.
RECORDED OFFLINE RESULT
The nominal high-heat research load is rejected despite fitting the power supply. Fifty of 200 varied cases report an essential-capacity shortfall.
Design, limits & next evidence +
What was built
Admit essential loads first. If they cannot fit, report an essential-capacity shortfall and issue no feasible mission plan. Consider optional loads by explicit priority and fixed requested time. Test every candidate against source power, energy already net of protected reserves, thermal inventory and cooling. Deposit slot heat before slot cooling as a conservative pulse approximation.
One task/reservation identifier has one owner; duplicate identifiers are invalid.
A mission load must satisfy all resource constraints, not just electrical power.
Recompute after faults. An infeasible essential baseline must not be described as a survival capability.
Independent local protection and AXIOM may constrain the installation separately; this advisory has no actuator connection.
Current limits
The model uses fixed time slots and a conservative thermal approximation. Real resource envelopes remain open.
Next verification
Replay measured equipment traces in shadow mode, followed by an isolated controller-in-the-loop bench. Inject delayed resource reports, cooling loss, rejected energy return and competing reservations. Independently calculate accepted-load envelopes and retain shortfalls.
Z7-JRS-R1 · Reference design + offline prototype
04 / SPACE SENSINGSpace
Outverse Diagnostic Hull Panel
Locate an event. Keep the evidence.
Combines temperature-compensated strain with acoustic arrival-time estimates to identify areas needing inspection.
RECORDED OFFLINE RESULT
All 20 deliberately biased timing cases remain uncertain. Across 100 selected event cases, 23 are uncertain overall; none confirms structural damage.
Design, limits & next evidence +
What was built
Use local strain and temperature measurements against a calibrated baseline. Correct the reference thermal strain and propagate declared uncertainty. Combine this with arrival-time localization from at least four distinct acoustic sensor locations. A bounded rectangular search can refine its best candidate. Output NO_CHANGE_DETECTED, INSPECT, UNASSESSED or UNCERTAIN; inspection evidence remains necessary to confirm damage.
Missing/stale calibrated readings produce UNASSESSED rather than a healthy-hull claim.
Compensate the specified thermal response and expose residual strain uncertainty.
Reject duplicate identities, insufficient distinct locations and collinear geometry. Retain poor-fit and boundary solutions as uncertain.
Never equate anomaly detection or a fitted event position with confirmed damage or shield interception.
Current limits
The reference model uses one isotropic wave speed and a two-dimensional panel. Material calibration and independent inspection are next.
Next verification
Calibrate an instrumented coupon over temperature and load before a blinded set of benign localized disturbances. Independently measure event locations and inspect the coupon. Include temperature changes, vibration, invalid channels, timing bias, wave dispersion and multiple events.
Z7-DHP-R1 · Reference design + offline prototype
05 / SHARED ARCHITECTUREShared architecture
CMC Independent Reference Witness
A reference with a witness.
Compares the CMC-derived estimate with two separately declared witness channels, checking timing, agreement and dependencies.
RECORDED OFFLINE RESULT
All 200 selected agreement and fault cases produce the expected advisory state. An integrated reference HOLD blocks the science plan.
Design, limits & next evidence +
What was built
Compare a CMC-derived reference estimate with two witness estimates in a common calibrated frame and epoch. Require distinct declared measurement origins, power and clock domains. Reject stale, invalid or misaligned observations. If witnesses agree with each other but both disagree with CMC, report a CMC disagreement HOLD; ambiguous witness conflict also remains HOLD.
Handle angular wrap correctly and compare only valid common-frame, common-epoch values.
Expose missing declared independence, stale data and clock misalignment as holds.
Distinguish CMC disagreement from ambiguous reference conflict; do not automatically claim the failed component is proved.
Supply no field, gravity, navigation or actuator correction automatically.
Current limits
Declared independence is a model input. It needs physical confirmation, calibrated reference transforms and measured timing.
Next verification
Measure the actual reference transforms and timing chain, then apply blinded controlled disturbances on an independently instrumented bench. Include common frame-calibration error, shared upstream dependencies, clock errors and loss of each channel.
Z7-CRW-R1 · Reference design + offline prototype
06 / EARTH MOBILITYEarth
Hydrogen Accountability Module
Account for every measured transfer.
Reconciles fuel receipts, consumption, authorized venting and remaining inventory, with uncertainty and independent gas alerts.
RECORDED OFFLINE RESULT
All 50 injected two-kilogram deficits are flagged within 200 simulated reading sets. No alerts occur in the 150 selected balanced-noise cases.
Design, limits & next evidence +
What was built
Account initial mass plus receipts minus consumption, authorized measured venting and final mass. Propagate standard uncertainty with independent groups and a limited common-bias correlation model. Report unexplained deficit or surplus beyond the declared decision threshold. A separate gas alert remains significant even with a balanced ledger. Normalize measured NOx mass by measured useful work where nonzero.
Use measured mass or a separately validated inventory model; do not estimate LH2 inventory with an ideal-gas shortcut.
Account authorized venting explicitly and flag both unexplained loss and unexplained gain.
An imbalance is an investigation trigger, not proof of a leak. Preserve independent gas detection.
A zero-useful-work interval has undefined normalized emissions, not zero emissions. No clean-air benefit is inferred from fuel identity.
Current limits
An inventory difference calls for investigation. Actual tank metrology and emissions measurements are still needed.
Next verification
First verify data and mass-accounting interfaces using an approved nonhazardous measurement surrogate. Hydrogen-specific testing then requires the actual qualified installation, calibrated reference inventory, controlled operating records and existing authorized safety procedures. Reconcile complete cycles and investigate all differences; perform matched-duty emissions measurement separately.
Z7-HAM-R1 · Reference design + offline prototype
07 / SPACE EXPLORATIONSpace
Atlas Science Opportunity Planner
Choose observations with purpose.
Selects a small observation set using declared scientific uncertainty, energy, data capacity, instrument timing and a protected return reserve.
RECORDED OFFLINE RESULT
The selected reference case yields 2.972 nats of modeled information against 2.308 for a simple comparator, while retaining six kWh including a four-kWh return allowance. All 60 varied cases respect the resource limits.
Design, limits & next evidence +
What was built
Represent selected scientific variables by independent Gaussian priors. Each candidate observation has a stated uncertainty, correlation group, instrument/time window, energy cost and data volume. Correlated repeats contribute only the best precision in their group. Enumerate small feasible subsets, maximize modeled information and prefer lower energy on equal score. Keep a simple benefit-first feasible baseline for comparison.
Keep the protected-return allowance and reject instrument conflicts or invalid observations.
Prevent repeated correlated observations from being treated as independent evidence.
Match quantity units and preserve HOLD when advisory authorization or return capacity is unavailable.
Report information as a model objective, not a discovery, mission-success probability or demonstrated science yield.
Current limits
Information gain depends on the assumed priors and correlations. The planner handles up to 18 fixed-time opportunities.
Next verification
Use withheld observation records with independently reviewed science questions and measured resource costs. Compare predeclared planning baselines on the same opportunities. Reconcile predicted and realized uncertainty reduction, including incorrect priors and correlations. Keep navigation and real mission permission outside the planner.
Z7-ASOP-R1 · Reference design + offline prototype
No matching developments. Try a shorter term or choose another branch.
ONE RECORDED INTEGRATION CASE
A reference disagreement changes the plan.
The CMC witness detects an injected disagreement. The advisory science plan enters HOLD and selects no observations. A separate essential-load reference case remains feasible.
01 / CMC WITNESS
Disagreement detected.
The reference and witness channels no longer support an agreement state.
02 / ATLAS PLANNER
Science planning held.
The advisory prerequisite is unavailable, so no observation set is selected.
03 / RESERVE ASSESSMENT
Essential loads assessed.
The separately evaluated reference load case retains its required resource margin.
An offline software example. No command is sent to hardware. Independent local protection, AXIOM authority and ZSA acceptance retain their separate roles.
Z7DP-R1 / RESEARCH REVIEW
Study the designs and results.
Each development identifies what its software checks covered and which physical measurements are still needed.
Concept and development authority: Fredrik Sommerseth Olsen.