Space CORAC

CORAC rescue and orbital handoff

Lekor, Lomec and Larko share a lander design and a proposed common crew-transfer module.

Fault response / Approach and transfer Interactive replay

Starting conditions

A rehearsal begins at the refuge. An available lander and a compatible orbital receiver must be identified.

Operating sequence

  1. Move from refuge to rover

    Use the outpost’s planned refuge-to-rover route and record the crew and support needs for the transfer.

  2. Assign available landers

    Check readiness of the common lander team. Assign a recovery lander and retain a separate standby option when the scenario permits.

  3. Check the receiving route

    Verify the module, lander interface and receiving Qi shuttle. Hold while pressure, support or authorization checks are unresolved.

  4. Transfer to orbit

    The proposed pressure-isolated cabin supports the crew through the lander departure and the planned shuttle handoff.

  5. Record the rehearsal

    Record fit, handling, timing and endurance items that require qualification before using the common module.

Concept view of CORAC’s connected lunar modules and a rover beside an airlock.
The rover and airlock illustrate the surface pickup stage. The rehearsal checks a separate orbital receiving route before crew transfer.

Hold and recovery

If the assigned lander is unavailable, select an available alternate in the rehearsal. Confirm receiving-route compatibility before transfer.

Model and references

Open the one-lander-unavailable rehearsal

ZENIT concept procedure. Models and replays use illustrative conditions.