Earth Fusion Facility startup and trip
Follow the Earth core from standby to qualified delivery at the separate SERAT Energy Island.
Startup / Shutdown / Fault response Interactive replay
Starting conditions
The Earth core is in standby. The protected energy interface stays isolated while the model checks vacuum, confinement, cooling and local protection.
Operating sequence
Review readiness
Check the four prerequisite conditions shown in the core model.
Establish plasma
The conceptual core admits and heats fuel after readiness checks pass.
Qualify the delivery path
Follow heat extraction and conditioning before the separate SERAT Energy Island accepts supply.
Observe a cooling fault
The replay halts startup or trips the running core when required cooling is lost.
Hold and recovery
Preserve local protection and check the cause of the fault. A later attempt starts with the readiness sequence again.
Model and references
Run the Earth core modelZENIT concept procedure. Models and replays use illustrative conditions.