SERAT power and thermal reserve
The reserve scheduler tests electrical power, usable energy and thermal capacity together before assigning optional loads.
Normal operation / Fault response / Recovery Interactive replay
Starting conditions
The scheduler can see essential demand, available energy and thermal capacity on their respective ledgers.
Operating sequence
Protect essential services
Allocate essential loads first and report a shortfall if they exceed the supported capacity.
Account for reserves
Declare available source power, stored energy after protected reserves, current thermal load and cooling capacity.
Check optional requests
Consider each request by priority and time. Accept it only if the power, energy and thermal limits can all be met.
Measure and recover
Track actual power and heat during the work. Available cooling and restored energy reserves inform the next allocation.
Hold and recovery
Hold an optional request when it would consume protected capacity. Reassess after fresh measurements establish usable reserve.
Model and references
Open the interactive cycleZENIT concept procedure. Models and replays use illustrative conditions.