Skip to Operations
EARTH & SPACE / PROGRAM ATLAS
← Operations catalogue

Space Zorak

Zorak Sick Bay shuttle handover

Trace the proposed handover from a compatible first-aid shuttle to the receiving team.

Approach and transfer / Recovery Procedure reference

Starting conditions

A first-aid shuttle arrives with a transfer record and a receiving medical team is available.

Operating sequence

  1. Verify the receiving route

    Confirm dock compatibility, route clearance and essential support availability in the handover study.

  2. Receive the patient and record

    Transfer along the verified route to the staffed reception space and confirm that the team receives the record.

  3. Continue the handover

    The receiving team reviews the record and assigns recovery or follow-up through the proposed medical workflow.

Concept cutaway of a first-aid shuttle interior.
The cutaway puts the receiving route in context. Dock fit, clearance and a ready receiving team are all checked before handover.

Hold and recovery

Keep the transfer pending while dock compatibility, clearance or the receiving team’s availability is unresolved. The medical team controls care decisions.

Model and references

Read the Sick Bay handover reference

ZENIT concept procedure. Models and replays use illustrative conditions.